{"id":5549,"date":"2016-11-30T00:00:00","date_gmt":"2016-11-29T23:00:00","guid":{"rendered":"http:\/\/dev.riocom.at\/danube-marchfeld-project-start-disaster-control-plans-flood\/"},"modified":"2024-03-07T21:58:19","modified_gmt":"2024-03-07T20:58:19","slug":"danube-marchfeld-project-start-disaster-control-plans-flood","status":"publish","type":"post","link":"https:\/\/dev.riocom.at\/en\/danube-marchfeld-project-start-disaster-control-plans-flood\/","title":{"rendered":"Danube-Marchfeld: Project &#8220;Disaster Control Plans Flood&#8221; started"},"content":{"rendered":"\n<h4 class=\"wp-block-heading\">Erster Einsatz von VISDOM im Katastrophenschutz<\/h4>\n\n<p class=\"wp-block-paragraph\">Am<strong> 21.11.2016<\/strong> startete nach langer Vorbereitung offiziell die Erstellung der Katastrophenschutzpl\u00e4ne Hochwasser f\u00fcr den Wasserverband Donau-Marchfeld. Standesgem\u00e4\u00df begannen wir das Projekt mit einer Informationsveranstaltung und einem gemeinsamen Arbeitstreffen aller Stakeholder.<\/p>\n\n<p class=\"wp-block-paragraph\">Dazu durften wir <strong>wesentliche Akteure<\/strong> aus folgenden Institutionen begr\u00fc\u00dfen:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>der Abteilung \u201eFeuerwehr und Zivilschutz\u201c des Landes Nieder\u00f6sterreich<\/li>\n\n\n\n<li>des Bezirksfeuerwehrkommandos G\u00e4nserndorf<\/li>\n\n\n\n<li>des Wasserverbandes Donau-Marchfeld, und<\/li>\n\n\n\n<li>der neun betroffenen Gemeinden (Gro\u00df-Enzersdorf, Andlersdorf, Mannsdorf an der Donau, Orth an der Donau, Haringsee, Eckartsau, Lassee, Engelhartstetten und Marchegg)<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\">Im Zuge dieses Projekts wird erstmalig die Software <a href=\"https:\/\/riocom.at\/simulation\/\">Visdom <\/a>zum Einsatz kommen. Damit stehen neue Werkzeuge und M\u00f6glichkeiten zur Modellierung, Visualisierung und Ma\u00dfnahmenanalyse zur Verf\u00fcgung.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Wir freuen uns auf ein spannendes Projekt.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>First application of <strong>VISDOM<\/strong> in disaster control<\/p>\n","protected":false},"author":1,"featured_media":12505,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39,40,1],"tags":[],"class_list":["post-5549","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-disaster-reduction-competencies","category-simulation","category-standard"],"_links":{"self":[{"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/posts\/5549","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/comments?post=5549"}],"version-history":[{"count":4,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/posts\/5549\/revisions"}],"predecessor-version":[{"id":12840,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/posts\/5549\/revisions\/12840"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/media\/12505"}],"wp:attachment":[{"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/media?parent=5549"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/categories?post=5549"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/tags?post=5549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}