{"id":5625,"date":"2017-12-15T00:00:00","date_gmt":"2017-12-14T23:00:00","guid":{"rendered":"http:\/\/dev.riocom.at\/life-lower-march-floodplain-construction-work-is-progressing\/"},"modified":"2024-02-24T14:16:15","modified_gmt":"2024-02-24T13:16:15","slug":"life-lower-march-floodplain-construction-work-is-progressing","status":"publish","type":"post","link":"https:\/\/dev.riocom.at\/en\/life-lower-march-floodplain-construction-work-is-progressing\/","title":{"rendered":"\u201cLife + Lower March Floodplain\u201d &#8211; Construction work is progressing"},"content":{"rendered":"&#13;\n<h3 class=\"wp-block-heading\">\u00a0\u2026und RIOCOM ist dabei!<\/h3>&#13;\n&#13;\n<p class=\"wp-block-paragraph\">Nachdem wir die <a href=\"https:\/\/riocom.at\/abschluss-der-planungsphase-life-untere-march-auen\/\">Ausschreibung zum Projekt im Juli 2017<\/a> abschlie\u00dfen konnten, befindet sich das Projekt derzeit in Bau. Unsere beiden Mitarbeiter <a href=\"https:\/\/riocom.at\/team-profil\/johannes-roither\/\">Johannes Roither<\/a> und <a href=\"https:\/\/riocom.at\/team-profil\/arnold-putz\/\">Arnold Putz<\/a> \u00fcbernehmen dabei sowohl die <strong>\u00f6rtliche Bauaufsicht<\/strong> als auch die <strong>Baustellenkoordination<\/strong>.<\/p>&#13;\n&#13;\n<p class=\"wp-block-paragraph\">Die gute Zusammenarbeit und Kommunikation mit dem Auftraggeber und mit dem Bauunternehmer sichern dabei eine erfolgreiche Bauphase.<br\/><strong>Noch bleiben etwa zwei Monate f\u00fcr die endg\u00fcltige Fertigstellung. Die Arbeiten sind auf einem guten Weg\u2026<\/strong><\/p>&#13;\n&#13;\n<p class=\"wp-block-paragraph\">Auftraggeber: <a href=\"http:\/\/www.viadonau.org\/home\/\">Via Donau<\/a><br\/>Ausf\u00fchrende Baufirma: <a href=\"https:\/\/www.bauunternehmen-steiermark.at\/\">Schullerbau &amp; Transport GmbH<\/a><br\/>\u00d6kologische Bauaufsicht: AVL \u2013 <a href=\"http:\/\/www.a-v-l.at\/\">ARGE Vegetations\u00f6kologie und Landschaftsplanung GmbH<\/a><\/p>&#13;\n&#13;\n<p class=\"wp-block-paragraph\"><a href=\"http:\/\/www.life-march.at\">www.life-march.at<\/a><\/p>&#13;\n&#13;\n<p class=\"wp-block-paragraph\">[FinalTilesGallery id=&#8217;35&#8217;]<\/p>&#13;\n","protected":false},"excerpt":{"rendered":"<p>The project &#8220;Life + Lower March Floodplain &#8221; is in the middle of the constructional implementation and RIOCOM takes over the local construction supervision and the construction site coordination.<\/p>\n","protected":false},"author":1,"featured_media":12746,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31,36,1],"tags":[],"class_list":["post-5625","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-flussrenaturierung","category-river-renaturation-competencies","category-standard"],"_links":{"self":[{"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/posts\/5625","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/comments?post=5625"}],"version-history":[{"count":3,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/posts\/5625\/revisions"}],"predecessor-version":[{"id":12527,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/posts\/5625\/revisions\/12527"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/media\/12746"}],"wp:attachment":[{"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/media?parent=5625"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/categories?post=5625"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.riocom.at\/en\/wp-json\/wp\/v2\/tags?post=5625"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}